RE-PURPOSING OF EXISTING SPACE/SMALL INTERVENTIONS The repurposing of existing spaces within the existing campus buildings aims to maximize utilization of current spaces while modernizing existing lecture theatres and classrooms, as well as increase office space and access to the external spaces. MCOMASHEE BLOCK SENTINEL BLOXCK As the College increases its utilization, attention can be given to upgrading the existing spaces, including the following: 1. Removal of existing sound boards in classrooms 2. Upgrades of existing lab spaces 3. Upgrade of existing Nursing Lab to meet accreditation requirements 4. Renovation of the Administration Building following the departure of Student Services 5. Find new location for Prayer Room 6. Branding continuity at all campuses 7. Additional, smaller renovations identified in the Renovation Opportunities Report 9757 [32"] [ [es a ge E it i “J = = F E GRaNMEBLOCK fy 3 "Tt cag a A pe uy 1 ADMINISTRATION: BLOCK I | BONNINGTON BLOCK [ = 4 UBRARY BLOCK Small Interventions: Amenity Pods 60 SELKIRK COLLEGE - CAMPUS MASTER PLAN 2020-2035