Phase 2 | 5-10 Years ACADEMIC BUILDING EXPANSION The expansion of the Monashee and Granite wings will double the capacity of these building and provide an opportunity for the buildings to have a more singular voice — nursing in one, geoscience in the other. As part of this intervention, Selkirk College will have an opportunity to address the following space requests: 1. Updated labs, if not achieved in phase one 2. Exterior Classrooms. This again will reduce demand on classrooms space that is currently used for staging during the start of the class time 3. Upgrade to washrooms in the area The expansion of Monashee and Granite should be maintained at a maximum of two storeys, and should not extend over the connecting corridor. By maintaining the connecting corridor at one storey and the buildings at two, we will respect the overall scale of the existing campus. EXPANDED BUILDING ENTRY A relatively unused area, the building entry to the Selkirk College on the Castlegar Campus provides an amazing opportunity to custom build Student Services and Student Support spaces at the building entry. This is inclusive of office/administration space, student amenity areas and the bookstore. This modest expansion will allow ‘O’ Wing to return to its use as a main thoroughfare, with the open office area providing much needed study area. With the renovations and additions proposed, Selkirk College will need to start to develop the associated green spaces/ landscaping. This may include expanded access to the West Courtyard, once the bookstore has been relocated. SELKIRK COLLEGE - CAMPUS MASTER PLAN 2020-2035 63