SITE PREVIOUS Site I YEAR ELEVATION NUMBER D&SIGNATION TYPE INTACT OBSERVED METERS ASL REMARKS DiQm: 7 7 Ox 1961 427 Site has been destroyed with inundation. Some washout of materials is expected in the future, DiQm:8 1,7 0 1977 427 Site has been destroyed with inundation and post-reservoir logging activities of Gelgar Corporation. DiQm:9 TA 7 0 1977 431 Site was exposed with reservoir flood- ing and has since been destroyed, Some future washout of material is expected to occur on the site. EDS )LQm:10 1,7 0 1977 458 Site has boon ‘destroyed with inundation - cloarding activities and pre-reservoir cultivation of ‘the site. LQms 1 VACANT | DiQm: 12 | VACANT DiQm:13 C2 7 0 1977 432 Site has been destroyed with inundation and clearing activities. Some future _ washout of materials is expected, DiQm:14 B2 1,7 ? 1967 Lhe Condition of this site is not known . ‘although it is presumed destroyed ot * withoyeservats flooding, RECOMMEND : Survey) of the site area, DiQm:15 TB 1,7. 100 1977 hy ‘This site is one of the few sites ‘with circular cultural depressions ‘that is ‘still intact on this area of ‘the Arrow Lakes. However, it is on a parcel of land which is owned by B.C. Hydro and is soon to be released | ‘for sale and private development. RECOMMEND: ‘Excavation of the site before B,C.